Docs / SSP & POA&M

Generating your SSP & POA&M

These two documents are the backbone of a CMMC assessment. Bastion builds both directly from the answers, notes, and evidence you entered — plus an executive readiness report for leadership.

On this page

The System Security Plan (SSP)

The SSP is the document that describes your in-scope system and explains how each of the 110 controls is implemented. It's required under NIST 800-171 (control 3.12.4) and is the first thing an assessor reads. A good SSP answers: what's the boundary, what's in scope, and for every control — how do you satisfy it, who owns it, and what's the evidence?

Bastion assembles your SSP from:

This is why the notes you write per control matter so much: they are your SSP. Write them clearly the first time and the document writes itself.

The Plan of Action & Milestones (POA&M)

The POA&M is your remediation roadmap: every control that isn't fully Met becomes a tracked entry with what's wrong, who owns it, and when it'll be fixed. It's how you demonstrate that gaps are managed, not ignored — and a credible POA&M is often what lets a supplier with an imperfect score stay eligible while they close out.

Bastion turns each Partially Met and Not Met control into a POA&M line containing:

FieldSource
Control ID & requirementThe NIST 800-171 control itself.
Current status & weaknessYour status and the gap described in your notes.
Point valueThe control's SPRS weight (5 / 3 / 1) — so you can prioritize.
OwnerThe responsible person you assign.
Target completion dateThe milestone date you set.

The remediation planner ties straight into the POA&M: as you sequence fixes, the what-if projected SPRS shows the score you'll reach once each milestone closes.

The executive readiness report

Not everyone needs the 110-control detail. The executive readiness report is a one-page summary for leadership or a prime: your current SPRS score, the gap picture by control family, the top remediation priorities, and your trajectory from the score-history snapshots. It's the "are we contract-ready, and if not, when?" view.

How Bastion builds them

Complete the assessment with honest statuses, implementation notes, and evidence on each control.
Assign owners and target dates to your open controls in the remediation planner.
Generate the SSP, POA&M, and executive report — Bastion compiles them from your data in seconds.
Export to portable formats to hand to your team, prime, or assessor. Everything is produced locally.

The artifacts are only as complete as your inputs. Controls with thin notes produce thin SSP sections; open controls with no owner or date produce incomplete POA&M lines. Fill those in before you export.

What assessors expect

Remember: Bastion produces audit-ready artifacts, but official certification is performed by a C3PAO. Use these documents to walk into that assessment prepared.

Next: Glossary Back to docs